- Large Diameter Drilled Shafts
- Diaphragm wall
- Hydromill
- Diaphragm Pile (Barrette)
- CFA Piles
- Root Piles
- Tiebacks
- Jet Grouting
- Cutter Soil Mixing
- Soil Improvement
- Environmental Geotechnics
- Large Diameter Drilled Shafts
- Driving of pre-cast piles
- Sheet Pile Driving
- Installation of pipes
- Foundation for platforms
- Manufacturing of Drilling Rigs
- Deep Shafts (Blind shafts)
- Pipeline Insertion System
Special Foundations
Offshore Foundations
Oil & Gas
New Technologies
Deep Shafts (Blind shafts)
Brasfond recently introduced Brazil to a new drilling technology for Deep Shafts called Blind Shaft. This method, as opposed to the Raise Boring process, executes the widening of the pilot hole from the surface, i.e., from top to bottom, which eliminates the previous existence of a tunnel or gallery in the far lower portion, providing a significant time-to-delivery reduction.
FAST AND SAFE, THE BLIND SHAFT REACHES DEPTHS GREATER THAN 2,630 FT AND DIAMETERS OF UP TO 315", WIDE IN A SINGLE PASS.
The use of the latest down-hole motors (Rotary Vertical Drilling System) for drilling the Pilot Hole provides the process with a unique capability to maintain the verticality of the hole, achieving results under 0.10% of vertical deviation.
The drilling of the Shaft using the reverse circulation process (air-lift) only uses water as a drilling fluid, which eliminates environmental damage since the material from the excavation can be used as an aggregate or even disposed of in locations near the worksite.
Learn more about the Deep Shafts
Specifications, construction sequences, case study.